Schneider ATS480D62Y Soft Starter
| Company Information | ||||||||
| [email protected] | ||||||||
| Mobile | +8615305023276 | |||||||
| +8615305023276 | ||||||||
| 15305023276 | ||||||||
| Add to | Room 1004, No. 62 Xiangxiu Li, Siming District, Xiamen City, Fujian Province, China | |||||||
Technical Specifications
| Parameter | Specification |
|---|---|
| Model | ATS480D62Y |
| Product Series | Altivar ATS480 |
| Product Type | Soft Starter |
| Rated Current | 62 A |
| Supply Voltage | 208–690 V AC |
| Control Supply Voltage | 110–230 V AC, 50/60 Hz |
| Number of Phases | Three-phase |
| Applicable Motor Type | Three-phase asynchronous motor |
| Typical Motor Power | Determined according to supply voltage, load class, and application conditions |
| Starting Method | Soft start |
| Stopping Method | Soft stop |
| Typical Applications | Pumps, fans, conveyors, compressors, and other industrial motor applications |
| Protection Degree | IP20 |
| Cooling Method | Forced-air cooling |
| Control Interface | Digital inputs, relay outputs, and analog interfaces |
| Communication Interface | RJ45 communication interface with support for applicable communication options |
| Parameter Configuration | Parameter setup and commissioning through compatible configuration tools |
| Installation Method | Vertical installation inside an electrical control cabinet |
| Operating Temperature | Typically -10 to 40°C; derating should be considered for higher ambient temperatures |
| Motor Connection | Standard three-phase motor connection |
| Dimensions | 290 × 190 × 247 mm |
| Weight | 8.3 kg |
FAQ
1. What type of motors is the ATS480D62Y suitable for?
The ATS480D62Y is designed primarily for starting and stopping three-phase asynchronous motors and has a rated current of 62 A. It can be used in a wide range of industrial applications, including pumps, fans, conveyors, compressors, and other motor-driven machinery where controlled acceleration and deceleration are required. When selecting the soft starter, the motor nameplate current should be considered more important than motor power alone. The actual selection should also take into account the load type, starting torque, acceleration time, duty cycle, and site power conditions. For machinery with high starting inertia or demanding starting torque requirements, the soft starter rating should be checked carefully to ensure reliable acceleration without unnecessary overcurrent or overload protection trips.
2. What supply voltage does the ATS480D62Y support?
The ATS480D62Y supports three-phase AC supply voltages from 208 to 690 V AC, making it suitable for a wide range of industrial power systems. Before installation, the incoming supply voltage should be verified against the requirements of both the soft starter and the connected motor. The motor winding configuration must also correspond correctly to the motor nameplate voltage. Even when the incoming voltage is within the soft starter’s supported range, an incorrect motor connection can result in excessive current, insufficient starting torque, abnormal heating, or protection trips. During commissioning, it is also recommended to check phase-to-phase voltage and confirm that the three-phase supply is properly balanced.
3. How does the ATS480D62Y reduce motor starting stress?
The ATS480D62Y controls the motor acceleration process so that the motor gradually increases from standstill to its normal operating speed instead of receiving the full electrical supply instantaneously as with direct-on-line starting. This controlled acceleration can reduce electrical inrush and mechanical shock transmitted to the motor shaft, coupling, gearbox, belt, pump, and other driven components. Proper adjustment of the acceleration and current-limiting parameters is particularly important for high-inertia loads. The starting current should not simply be reduced as much as possible, because excessive current limitation may prevent the motor from developing enough torque to accelerate the load. The objective is to achieve a controlled and reliable start while maintaining sufficient torque throughout the acceleration period.
4. What should be checked if the ATS480D62Y experiences excessive current or fails to start the motor?
The first step is to verify the motor rated current and other relevant motor parameters configured in the soft starter. The incoming three-phase voltage should then be checked to ensure that it is stable and correctly supplied. The actual motor current during acceleration should also be monitored to determine whether the high current is caused by the electrical system or the mechanical load. A blocked pump, overloaded conveyor, seized bearing, excessive fan resistance, or other mechanical problem can cause unusually high starting current even when the soft starter parameters are correct. The acceleration time should also be reviewed. If the acceleration period is too short for a high-inertia load, the motor may require excessive torque and current to reach operating speed. A systematic inspection of the fault history, measured current, motor wiring, mechanical load, and starting parameters is generally more effective than immediately replacing the soft starter.
5. What should be checked when a phase-loss fault occurs on the ATS480D62Y?
When a phase-loss or phase-related fault occurs, the incoming three-phase power should be checked first. Measure the voltage between the phases and confirm that all three phases are present and within the expected operating range. The upstream circuit breaker, fuses, contactors, cable connections, and terminal blocks should then be inspected for loose connections, overheating, damaged conductors, or poor electrical contact. The motor output side should also be checked to confirm that the U, V, and W connections are correctly installed and securely tightened. If the input supply and external wiring are confirmed to be normal, the motor windings and the soft starter’s power and current-sensing circuits may require further inspection. Electrical safety procedures, including isolation and verification of a de-energized condition, should always be followed before working inside the control cabinet.
6. Is the ATS480D62Y suitable for pump applications?
Yes. The ATS480D62Y can be used for various industrial pump systems driven by three-phase asynchronous motors. Soft starting allows the motor and pump assembly to accelerate progressively, which can reduce sudden mechanical stress and hydraulic disturbances compared with direct starting. In suitable pump applications, controlled stopping can also help reduce sudden pressure changes within the piping system. However, the correct parameters depend on the pump type, motor characteristics, pipeline configuration, fluid properties, and starting load. Pumps that require high initial torque may need carefully selected starting parameters to ensure that the motor can accelerate reliably. Excessive current limitation should be avoided if it prevents the motor from producing sufficient torque during startup.
7. Why does the ATS480D62Y trip on overload after operating for a period of time?
If the motor starts normally but the ATS480D62Y reports an overload condition after running for some time, the motor’s actual operating current and mechanical load should be investigated. First, verify that the motor rated current configured in the soft starter matches the motor nameplate. Then measure the three-phase operating current under normal load and compare the readings between phases. Continuously elevated current can indicate excessive mechanical load, such as increased pump resistance, an overloaded conveyor, abnormal fan system resistance, damaged bearings, poor lubrication, or problems within the transmission system. The control cabinet’s ambient temperature and ventilation should also be checked because excessive heat can increase thermal stress. If the overload occurs after a predictable operating period, reviewing the operating time, current trend, ambient conditions, and fault history can help identify whether the cause is electrical, mechanical, or thermal.
8. Which parameters should be checked during initial commissioning of the ATS480D62Y?
During initial commissioning, the motor nameplate information and basic application parameters should be carefully verified before the first full-load start. The motor rated current, supply conditions, motor connection, starting time, current limitation, and stopping parameters should be checked according to the actual application. Pump applications generally require particular attention to smooth acceleration and controlled stopping, while conveyors, compressors, and other high-inertia loads may require sufficient starting torque and an appropriate acceleration period. After configuration, the system should first be tested under controlled conditions while monitoring motor current, phase balance, acceleration behavior, abnormal vibration, unusual noise, and protection status. Once the initial test is successful, several start-stop cycles should be performed under representative load conditions. This helps confirm that the ATS480D62Y can consistently accelerate the motor to normal speed, maintain stable operation, and stop the equipment without unnecessary protection trips.
Schneider ATS480D62Y Soft Starter is in stock. Please contact us for a quick quote and competitive pricing.
| Company Information | ||||||||
| [email protected] | ||||||||
| Mobile | +8615305023276 | |||||||
| +8615305023276 | ||||||||
| 13950166376 | ||||||||
| Add to | Room 1004, No. 62 Xiangxiu Li, Siming District, Xiamen City, Fujian Province, China | |||||||
Company Introduction
Xiamen Shengruite Trading Co., Ltd. is a company specializing in the supply of industrial PLC spare parts.
We provide high-quality PLC spare parts to customers in the global manufacturing, energy and power, chemical and other fields.
Since its establishment in 2011, after 13 years of rapid development, the cumulative global shipments have reached 223,650 pieces, with an annual output value of US$50 million.
Successfully served more than 500 customers in more than 100 countries and regions including Saudi Arabia, UAE, the United States, Europe, Africa, and Southeast Asia
Our Mission
Provide customers with the best quality PLC spare parts and the fastest delivery service to ensure that their industrial automation systems are always in the best operating condition.
We provide a 1-year warranty service, and we support returns and exchanges for any issues to ensure your rights and interests are fully protected.
We can provide detailed product images upon request, and our team can arrange warehouse photos for confirmation to ensure you have all the information you need before making a purchase.
Shipping times vary depending on your location. With the support of our 16 global warehouses, we strive to deliver orders as quickly as possible. Contact us to get an estimated delivery time for your specific location.
The minimum order quantity (MOQ) is typically one unit. However, for larger orders, please contact us for potential discounts and pricing details.
Yes, we offer competitive pricing for bulk purchases. Please reach out to our sales team with the specifics of your order to receive a custom quote.
We accept various payment methods for wholesale orders, including bank transfers (T/T), letters of credit, and other options upon agreement. For large transactions, please contact us directly for payment terms.
Yes, we offer flexible ordering options for both small and large quantities. Whether youre looking for a single unit or a large batch, we can accommodate your needs.
We occasionally offer promotional discounts for new wholesale customers. Contact us to learn more about any current offers available for first-time buyers.
If you are unsure of compatibility with your existing setup please provide your system details and our support team can verify compatibility prior to purchase.
Returns are accepted within 30 days if the product is unused, unopened, and in its original packaging. Please note that return shipping and associated costs are the buyer\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\’s responsibility.
Yes, we offer technical support for the installation and integration of our products. Our team can assist with setup, configuration, and troubleshooting to ensure a smooth installation.








