GE DS200TCEBG1ACE Protective Terminal Expansion Board
| Company Information | ||||||||
| [email protected] | ||||||||
| Mobile | +8615305023276 | |||||||
| +8615305023276 | ||||||||
| 15305023276 | ||||||||
| Add to | Room 1004, No. 62 Xiangxiu Li, Siming District, Xiamen City, Fujian Province, China | |||||||
Technical Specifications
| Parameter | Specification |
|---|---|
| Manufacturer | GE |
| Model | DS200TCEBG1ACE |
| Product Type | Protective Terminal Expansion Board |
| Series | Mark V |
| Functional Acronym | TCEB |
| Board Function | Protective terminal expansion and signal interface |
| Signal Processing | CT and PT signal scaling and conditioning |
| Signal Transformers | 4 |
| 26-Pin Connectors | 1 |
| 10-Pin Connectors | 4 |
| 20-Pin Connectors | 3 |
| Bayonet Connectors | JWX, JWY, JWZ |
| Installation | GE Mark V control system |
| Application | Turbine control and protection |
| Dimensions | 180 × 120 × 25 mm |
| Weight | 0.794 kg |
FAQ
1. What is the main function of the GE DS200TCEBG1ACE Protective Terminal Expansion Board?
The DS200TCEBG1ACE is a protective terminal expansion board used in the GE Mark V turbine control system. It provides signal interface and conditioning functions for several control and protection circuits. The board is associated with CT and PT signal processing and provides appropriate signal paths between field termination circuits and the control system. It can also be involved in signal circuits related to flame detection, magnetic pickup, and emergency overspeed functions. Its role is to ensure that important field signals are properly transferred and conditioned for use by the relevant Mark V control and protection circuitry.
2. What types of signals are handled by the DS200TCEBG1ACE?
The DS200TCEBG1ACE handles several signal types associated with turbine monitoring and protection. CT and PT signals are processed through dedicated circuitry for use by the control system, while other connections can be associated with flame detection, magnetic pickup, and emergency overspeed functions. Because these signal paths can have different electrical characteristics and purposes, correct termination and wiring are essential. When troubleshooting, technicians should identify the affected signal path first and then inspect the corresponding connector, cable, terminal circuit, and associated control board.
3. Where is the DS200TCEBG1ACE installed in the GE Mark V system?
The DS200TCEBG1ACE is designed for installation within the GE Mark V turbine control system. Its position within the control architecture allows it to interface with related terminal boards and control circuitry. During installation or replacement, the original board position and cable connections should be carefully documented. Each connector should be returned to its correct location because the board contains multiple independent signal paths. Incorrect connector placement can cause missing measurements, incorrect signal values, or faults in related control and protection functions.
4. How many connectors are available on the DS200TCEBG1ACE?
The board uses several connector types to interface with different parts of the Mark V control system. It includes one 26-pin connector, four 10-pin connectors, and three 20-pin connectors. It also incorporates bayonet-style connectors identified as JWX, JWY, and JWZ. Because each connector can correspond to a different signal group, connector identification is important during maintenance. Before removing the board, technicians should label the connected cables or record their positions so that the replacement board can be connected in the same configuration.
5. What should be checked if CT or PT measurements connected through the DS200TCEBG1ACE are incorrect?
First check the field wiring and connector condition associated with the affected CT or PT signal. Look for loose terminals, damaged conductors, incorrect connections, or poor contact. The related signal path and associated terminal boards should also be inspected. If the input signal is confirmed to be correct but the processed value remains abnormal, the board’s signal conditioning circuitry and signal transformers should be investigated. It is also important to check the downstream control circuitry because an abnormal indication may originate from another component rather than the DS200TCEBG1ACE itself.
6. What are common causes of DS200TCEBG1ACE faults?
Typical causes include incorrect wiring, loose connectors, damaged cables, electrical interference, component aging, contamination, excessive electrical stress, and improper handling during maintenance. Since the board handles multiple control and protection signals, a problem with one signal path may affect only a specific turbine function rather than the entire board. Troubleshooting should therefore begin by identifying the exact affected function. Technicians can then inspect the relevant cable, connector, input signal, output signal, associated terminal board, and downstream control circuitry to determine the actual fault location.
7. Can the DS200TCEBG1ACE be replaced without checking the associated system configuration?
The board should not be replaced without first checking the existing system configuration and wiring. Although a replacement board may have the same basic model designation, the connected signal arrangement must match the application in which it is installed. Before removal, record all connector positions and cable routing and inspect the existing board for configuration differences or hardware revisions. After installation, verify each signal path individually. This is particularly important for turbine protection circuits because an incorrect connection can result in unreliable measurements or affect the availability of a protection function.
8. What should be verified after installing a replacement DS200TCEBG1ACE?
After installation, verify that the board is securely mounted and that every connector is installed in its correct position. Check the CT and PT signal paths and confirm that the expected values are available to the associated control circuitry. Depending on the Mark V configuration, flame detection, magnetic pickup, emergency overspeed, and other protection-related signal paths should also be checked. Inspect the cable routing and connections for signs of interference or poor contact. Finally, perform the required system-level functional tests to confirm that control, monitoring, alarm, and protection functions operate correctly before returning the turbine control system to normal service.
GE DS200TCEBG1ACE Protective Terminal Expansion Board is in stock. Please contact us for a quick quote and competitive pricing.
| Company Information | ||||||||
| [email protected] | ||||||||
| Mobile | +8615305023276 | |||||||
| +8615305023276 | ||||||||
| 13950166376 | ||||||||
| Add to | Room 1004, No. 62 Xiangxiu Li, Siming District, Xiamen City, Fujian Province, China | |||||||
Company Introduction
Xiamen Shengruite Trading Co., Ltd. is a company specializing in the supply of industrial PLC spare parts.
We provide high-quality PLC spare parts to customers in the global manufacturing, energy and power, chemical and other fields.
Since its establishment in 2011, after 13 years of rapid development, the cumulative global shipments have reached 223,650 pieces, with an annual output value of US$50 million.
Successfully served more than 500 customers in more than 100 countries and regions including Saudi Arabia, UAE, the United States, Europe, Africa, and Southeast Asia
Our Mission
Provide customers with the best quality PLC spare parts and the fastest delivery service to ensure that their industrial automation systems are always in the best operating condition.
We provide a 1-year warranty service, and we support returns and exchanges for any issues to ensure your rights and interests are fully protected.
We can provide detailed product images upon request, and our team can arrange warehouse photos for confirmation to ensure you have all the information you need before making a purchase.
Shipping times vary depending on your location. With the support of our 16 global warehouses, we strive to deliver orders as quickly as possible. Contact us to get an estimated delivery time for your specific location.
The minimum order quantity (MOQ) is typically one unit. However, for larger orders, please contact us for potential discounts and pricing details.
Yes, we offer competitive pricing for bulk purchases. Please reach out to our sales team with the specifics of your order to receive a custom quote.
We accept various payment methods for wholesale orders, including bank transfers (T/T), letters of credit, and other options upon agreement. For large transactions, please contact us directly for payment terms.
Yes, we offer flexible ordering options for both small and large quantities. Whether youre looking for a single unit or a large batch, we can accommodate your needs.
We occasionally offer promotional discounts for new wholesale customers. Contact us to learn more about any current offers available for first-time buyers.
If you are unsure of compatibility with your existing setup please provide your system details and our support team can verify compatibility prior to purchase.
Returns are accepted within 30 days if the product is unused, unopened, and in its original packaging. Please note that return shipping and associated costs are the buyer\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\’s responsibility.
Yes, we offer technical support for the installation and integration of our products. Our team can assist with setup, configuration, and troubleshooting to ensure a smooth installation.








